290 West Main Street, Northborough:
Site Plan for Office/Commercial Businesses; some of the tasks for this project: Hydrology and stormwater management drainage and groundwater recharge system design for the proposed building and parking lot which discharges fully treated stormwater to the existing municipal drainage system. The site included work in a groundwater protection overlay district and required utility connection to the municipal sewer, water, and gas mains in West Main Street. MAP
(1.2Mb)
Note: The plan is for display purposes only and is not for permitting or construction.